DR Cutover – On-Prem RKE2 to Cloud Cluster¶
Purpose: Perform a controlled DR cutover from the on-prem RKE2 cluster to a cloud-based RKE2/managed cluster when the on-prem platform is unavailable or outside SLO.
Owner: Platform / SRE team (HybridOps.Studio)
Trigger: Prometheus/Alertmanager jenkins_critical_down or rke2_cluster_unhealthy alert, or a scheduled DR drill.
Impact: Changes the active production control-plane and workloads from on-prem RKE2 to a cloud cluster; DNS / Front Door endpoints will point to cloud.
Severity: P1 – platform-level outage or DR drill simulating such an outage.
Pre-reqs: On-prem and cloud environments configured; DR workflows defined in GitHub Actions; Cost Decision Service configured and tested.
1. Scenario overview¶
This runbook covers the active cutover from:
- Primary: on-prem RKE2 cluster.
- Secondary: DR/cloud RKE2 or managed Kubernetes cluster.
Automation is driven by:
- Prometheus federation + Alertmanager for detection and alerts.
- GitHub Actions as the stateless DR orchestrator (see ADR-0701).
- A Cost Decision Service that checks cost artefacts before scaling or promoting the cloud environment (see ADR-0801).
You can use this runbook for:
- Live incidents (on-prem RKE2 or Jenkins unavailable beyond SLO).
- Scheduled DR drills to validate procedures and artefacts.
2. Preconditions and checks¶
Before proceeding:
-
Confirm the alert:
-
Check Alertmanager for:
jenkins_critical_downrke2_cluster_unhealthy- Any relevant SLO breach alerts for critical workloads (e.g. NetBox).
-
Ensure alerts are not caused by a short-lived blip (for example, a brief maintenance window).
-
Confirm on-prem status:
-
Attempt
kubectl get nodesagainst the on-prem RKE2 cluster. - Check Jenkins controller status on
ctrl-01if accessible. -
If access is possible and the issue is minor, consider standard remediation before DR.
-
Confirm cloud DR readiness:
-
Verify the last successful DR drill or DR prep run:
- Check GitHub Actions history for DR-related workflows.
- Confirm the last known-good run did not report errors during cloud cluster bootstrap.
-
Confirm stakeholder approvals:
-
For real incidents (not drills), ensure incident lead / product owner has approved initiating DR cutover.
- For scheduled drills, ensure announcement/communications are in place if this is visible to users.
3. Phase 1 – Initiate DR workflow and cost check¶
Goal: Start the DR pipeline and ensure cost guardrails are respected before scaling the cloud environment.
- From GitHub, navigate to the repository containing DR workflows (for example,
hybridops-studio/infra-dror the main repo if workflows live there). - Open the DR cutover workflow (for example:
dr-cutover-onprem-to-cloud.yml). - Manually dispatch the workflow if it has a
workflow_dispatchtrigger, or confirm it was triggered automatically byrepository_dispatchfrom the alert webhook. - When prompted for parameters (if applicable), supply:
environment:dr-testordr-prod(as appropriate).reason: short description referencing the incident or drill ID.- Monitor the early stages of the workflow logs:
- Confirm it runs the Cost Decision Service step.
- Verify that it loads cost artefacts (for example, from
output/artifacts/cost/) and reports:- Projected cost.
- Threshold / budget.
- Decision: ALLOW or DENY.
If cost decision is DENY¶
- For drills:
- Record the result; do not override unless the drill explicitly tests override flow.
- File a follow-up to adjust cost model or thresholds if appropriate.
- For real incidents:
- Escalate to the incident commander / product owner:
- Present projected cost vs threshold.
- If override is agreed, follow the manual override process (for example, re-run workflow with an
override=trueflag or a separate override workflow).
- Document the override in the incident notes.
Do not proceed with full cutover steps until the cost decision is ALLOW or an override has been explicitly approved.
4. Phase 2 – Bring up or scale the cloud cluster¶
Goal: Ensure the cloud cluster is running at the desired capacity and can host the workloads.
The DR workflow should:
- Apply Terraform/Ansible (or equivalent) steps to:
- Create or scale the cloud RKE2/managed cluster.
- Ensure node pools and system components are ready.
- Capture logs and plan/apply outputs into:
output/artifacts/infra/rke2/output/artifacts/dr/
While the workflow runs:
- From a shell with access to the cloud cluster, verify:
export KUBECONFIG=~/.kube/rke2-cloud-dr.yaml
kubectl get nodes -o wide
kubectl get pods -A
- Confirm:
- All core system pods are
RunningorCompleted. - No critical components are crashlooping (for example, ingress controller, DNS, CNI).
If the cloud cluster does not stabilise:
- Pause DR cutover.
- Investigate and remediate (node capacity, network, control-plane issues).
- Only proceed once the cluster is healthy.
5. Phase 3 – Deploy workloads and data dependencies¶
Goal: Ensure Jenkins, NetBox and other critical workloads are deployed and wired to the right data stores.
-
Confirm that the DR workflow (or a follow-on pipeline) has:
-
Deployed platform components (ingress, ESO, Longhorn, observability stack).
-
Deployed application workloads (for example, NetBox) using GitOps manifests.
-
Validate data dependencies:
-
Confirm the DR PostgreSQL replica has been promoted to primary (if applicable).
-
Check that workloads such as NetBox are pointing to the cloud PostgreSQL instance, not the on-prem LXC.
-
Basic application checks:
-
kubectl get svc -Ato confirm services and ingress resources exist. - Application-level health checks (for example, HTTP 200 from NetBox
/healthendpoint) via port-forward or the cluster ingress.
Record key kubectl outputs and any application health screenshots/logs under:
output/artifacts/dr/output/artifacts/apps/netbox/if NetBox is in scope.
6. Phase 4 – Cut over DNS / Front Door¶
Goal: Switch user-facing traffic from on-prem to the cloud cluster in a controlled manner.
-
Identify the current ingress path:
-
DNS record(s) pointing to on-prem ingress or
-
Azure Front Door or equivalent configuration used as the main entry point.
-
Prepare the new endpoints:
-
Confirm the cloud ingress / Front Door backend for the DR cluster is:
- Healthy in the load balancer view.
- Returning expected responses.
-
Apply the cutover:
-
Update DNS records to point to the cloud entry point, or
-
Update Azure Front Door (or equivalent) to route traffic to the cloud backend instead of on-prem.
-
Monitor:
-
Application logs for increased traffic on the cloud cluster.
- Error rates and latency via Prometheus/Grafana or cloud-native monitoring.
Document:
- Exact time of cutover.
- Records or Front Door configuration changes.
- Screenshots / CLI outputs as needed.
Store these under:
output/artifacts/dr/- Any scenario-specific subfolder (for example,
dr-<date>-onprem-to-cloud/).
7. Phase 5 – Post-cutover monitoring and stabilisation¶
For at least the first 30–60 minutes after cutover:
-
Monitor:
-
Application SLOs (availability, latency).
- Error budgets for critical paths.
-
Infrastructure health (node utilisation, pod restarts).
-
Address any urgent issues:
-
Scale node pools or replicas as needed, within cost guardrails.
-
Roll out configuration changes or hotfixes via GitOps/CI where necessary.
-
Confirm with stakeholders:
-
Business/product owners are aware the service is now running in DR/cloud.
- Any temporary limitations (for example, reduced capacity or disabled non-critical features) are known.
8. Phase 6 – Evidence and documentation¶
Before closing the runbook:
-
Ensure the DR workflow run in GitHub Actions has:
-
Completed successfully.
-
Logs and artefacts archived as needed.
-
Verify the following proof locations contain up-to-date artefacts for this DR event:
output/artifacts/infra/rke2/-
Update:
-
Incident or drill ticket with links to:
- The GitHub Actions run.
- Relevant proof folders.
- Any dashboards used during the event.
-
If this was a drill:
-
Capture lessons learned.
- File follow-up tasks for:
- Runbook clarifications.
- Automation improvements.
- Cost model adjustments.
9. Rollback / failback (summary)¶
A full failback procedure should be covered in a dedicated runbook, but at a high level:
- Restore on-prem RKE2 and platform to a healthy state.
- Re-sync data from the cloud primary back to on-prem (or promote a new primary).
- Reverse DNS / Front Door changes once on-prem is ready and validated.
- De-scale or tear down DR resources as appropriate, following cost guardrails.
Link this runbook to the failback runbook once that document is created.
10. Validation checklist¶
- [ ] Alerts indicate a sustained on-prem platform problem (not a brief blip).
- [ ] Cost Decision Service authorised the DR action or a documented override was approved.
- [ ] Cloud cluster is healthy and running core platform components.
- [ ] Critical workloads (for example, NetBox, Jenkins agents) are running and wired to the correct data stores.
- [ ] DNS / Front Door cutover completed and traffic now flows to the cloud cluster.
- [ ] Application SLOs are within acceptable ranges post-cutover.
- [ ] Evidence folders under
output/artifacts/dr/,output/artifacts/infra/rke2/, andoutput/artifacts/cost/have been updated and linked to the incident or drill ticket.
References¶
- ADR-0202 – Adopt RKE2 as Primary Runtime for Platform and Applications
- ADR-0701 – Use GitHub Actions as Stateless DR Orchestrator
- ADR-0801 – Treat Cost as a First-Class Signal for DR and Cloud Bursting
- Evidence 4 – Delivery Platform, GitOps and Cluster Operations